D1.1 System Requirements Review Report. The deliverable compiles and manages the system requirements.
D2.1 Computing Node Conceptual Design. The deliverable includes the technical, performance, operational and support characteristics for the System as an whole entity.
D3.1 Computing Node Detailed Design. The deliverable produces detailed design data for hardware, interfaces and software.
D4.1 Computing Node Manufacturing Result. This will be the manufactured product developed from the detailed design, in accordance with the system specification and safety considerations.
D5.1 Computing Node Test Report. This report will compile test results and evidences from the verification & validation process.
D6.1 System Integration Update. This deliverable will contain the last version of all documents updated with tests and results from the Computing Node integration phase. Including manuals, drawings, parts list, etc.
D7.1 Report on the signature of the Consortia Agreements.
D7.2 Plan for Communication, Dissemination and Exploitation of project results. This deliverable will develop a plan of communication activities, a plan for dissemination of project results and a plan for exploitation of project results and handling of IP rights linked to project outputs.
D7.3 Report on Communication, Dissemination and Exploitation actions. This document will report on the outcomes of the activities related to Communication, Dissemination and Exploitation actions.